What has it Cost ?

Monday, 25 April 2016

Demo Day

We planned a day to gut out the front lounge area and pull out the ceiling.
We were pleasantly surprised to see new "C" Channel roof supports and fiberglass
insulation  had been installed.  We had expected the roof to be timber.

Now that we have stripped it back better we can see the water damage, we will replace wall and floor boards, and give it a primer coat with anti-mould paint.

 A few hours later, and a ute full of rubbish to take to the tip and we were done.

The next job will be to take the heavy checkerplate off the sides of the roof and install gas struts to aid in the lifting.
These photos are the efforts of today.

No comments:

Post a Comment